02
Aug
BSJ & Alexander Global – http://www.alexander-logistics.de/ – managed to load petrochemical plant from Germany to Bandar abbas, related to Miandoab Petrochemical plant which part of the details of cargo as follows :
1 tank / 11,7 x 4,7m x 4,9m / 10,5 Tonnen
1 tank / 10,0 x 4,2 x 4,7m / 9,5 Tonnen
1 dryer / 130 Tonnen / 2500 x 450 x 460cm
2 Reactor / 45 Tonnen je / 850 x 550 x 600cm
1 tank / 780 x 385 x 450cm / 12,5 Tonnen
The whole project will be 6.000 frt and 250×40‘ containers
Splitted in several LOTs (min. 6 container LOTs and 5 B/B Lots)